All of the following are true of cost plus fixed fee (CPFF) contracts, except:
a The seller is reimbursed for all allowable costs incurred performing the
contract work.
b The seller receives a fixed fee calculated as a percentage of the initial
estimated project cost.
c The fee does not change based on the performance of the seller.
d The seller receives a fee calculated as a fixed percentage of the actual
project cost.